587576
27
Zoom out
Zoom in
Previous page
1/32
Next page
Start up
After all components are
connected and tested, the system
can be put into operation. To
ensure proper function, a function
test should be made to recognize
any irregularities during operation
of the units before transfer to the
client.
Function test and test run
Check the following points.
■
Leak tightness of refrigerant
lines.
■
Even run of compressor and
fan.
■
Discharge of cold air on the
interior unit and heated air on
the exterior unit during cooling
operation.
■
Function test of the interior unit
and all program runs.
■
Check of the surface
temperature of the suction
line and determination of
evaporator overheating. To
measure the temperature, hold
the thermometer to the suction
line and subtract the boiling
point temperature reading on
the pressure gauge from the
measured temperature.
■
Documentation of the
measured temperatures in the
start up protocol.
Function test of Cooling
operating mode
1. Remove the caps on the valves.
2. Start operation by opening
the blocking valves of the
exterior unit momentarily until
the pressure gauge shows a
pressure of approx. 2 bar. .
3. Check all connections for leaks
with leak detection spray and
suitable leak detectors.
4. If not leaks are found, open the
blocking valves by turning them
in counterclockwise direction
with a hexagon wrench to the
stop. If leaks were found, draw
off the refrigerant and rework
the defective connection. In
this case, a new vacuum and
drying procedure is imperatively
required!
5. Turn the main switch on the
building or the fuse on.
6. Turn the unit on via the remote
control and select the cooling
mode, maximum fan speed and
lowest nominal temperature.
7. Measure all required values,
record them in the start up
protocol and check the safety
functions.
8. Check the unit control with
the functions described in
chapter „Operation“.
Timer, temperature setting, fan
speed and change between air
circulation or dehumidification
mode.
9. Check the function of the
condensation line by pouring
distilled water into the
condensation pan.
To do so, use a spout to guide
the water into the condensation
pan.
10.
Switch the interior unit to
cooling mode.
11.
Check all regulating, control
and safety devices for function
and correct adjustment during
the test run.
12.
Check the control of the
interior unit with the functions
described in the operating
instructions
(Timer, temperature
adjustments and all mode
settings).
13.
Measure the overheating,
external, internal, discharge and
evaporator temperatures and
record the test data in the start
up protocol.
14.
Remove the pressure gauge
and install the caps.
The start up may only be
made by especially trained
technicians and must be
documented accordingly.
NOTE
Due to the turn on delay, the
compressor will start up a few
minutes later.
NOTE
Then check the blocking valves
for leaks.
NOTE
Final tasks
■
Reinstall all parts which were
removed.
■
Familiarize the operator with
the system.
27
27


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for REMKO ATY260 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of REMKO ATY260 in the language / languages: English as an attachment in your email.

The manual is 1,23 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of REMKO ATY260

REMKO ATY260 Additional guide - German - 1 pages

REMKO ATY260 User Manual - German - 32 pages

REMKO ATY260 User Manual - Dutch - 32 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info