555374
5
Zoom out
Zoom in
Previous page
1/8
Next page
3
Commissioning the heating system
Logano G115 WS US/CA – 6 720 804 873 (2012/10) 5
3 Commissioning the heating system
3.1 Turning the heating system on
Before switching on, ensure that:
the operating water pressure is sufficient,
the fuel supply has been turned on at the main shut-off valve, and
the heating system emergency shut-off switch is in the ON position.
3.2 Checking the operating pressure, topping up the
boiler water and bleeding air from the system
The water used for filling the heating system loses a substantial amount
of volume in the first few days due to the release of its gas content. This
causes air pockets to form and the heating system starts to make noises.
B With new heating systems, check the operating pressure daily at first,
topping up the boiler water and bleeding the system and radiators (if
so equipped).
B Later on, check the operating pressure monthly, topping up boiler
water and bleeding the boiler and radiators (if so equipped).
3.2.1 Checking the operating pressure
Your heating contractor will have set the system to the required
operating pressure of at least 15 psi (1 bar) and entered the setting in
Tab. 1, page 5.
B Read the current operating pressure (psi) and temperature (°F) from
the temperature/pressure gauge.
B If the temperature/pressure gauge needle drops below the minimum
pressure marker of 15 psi, the operating pressure is too low. Top up
the system until the contractor's selected operating pressure is
reached.
Fig. 2 Pressure/temperature gauge
3.2.2 Topping up the boiler water and bleeding the system
Ask your heating contractor to show you where the boiler fill & drain
valve for topping up the heating system is located in your heating
system.
B If there the fill valve is not hard piped to the water supply, you will
need to connect a hose.
B Fill the heating system by slowly opening the fill valve. Observe the
pressure gauge (pressure/temperature gauge) while doing so.
B Close the boiler fill valve once the required operating pressure has
been reached.
B Bleed the system via the air vent and the radiator bleed valves (if so
equipped).
B Top up with additional water if the pressure drops as a result of
bleeding the system.
7 747 010 720-24.2RS
CAUTION: Health risk from contaminated domestic
water.
B It is imperative that you observe all regulations and
standards applicable in your country regarding
prevention of domestic water contamination.
CAUTION: Risk of damage to system due to temperature
stress.
If you fill the heating system when it is hot, the resulting
temperature stress can cause stress cracks and a leak in
the boiler.
B Only fill the heating system when cold (the flow
temperature should be no more than 100 °F).
CAUTION: Risk of system damage due to frequent
topping up.
If you have to top up the heating water frequently, the
heating system may suffer damage from corrosion or
scaling due to repeated introduction of oxygen.
B Ask your heating contractor if the local water can be
used untreated or whether it needs to be treated.
B Notify your heating contractor if you find you need to
top up your heating system frequently, as there may
be a leak.
Operating pressure
Design operating pressure
(optimum setting) _____________ psi
Maximum heating system operating
pressure
(standard = 30 psi)
_____________ psi
Table 1 Operating pressure (entered by system installer)
5


Need help? Post your question in this forum.

Forumrules
1

Forum

buderus-logano-g115-ws

Reset search

  • Every time I punch red button the boiler starts up but within a minute it shuts down. Why? Submitted on 3-10-2022 at 20:31

    Reply Report abuse
  • Every time I hit ted circular button boiler starts up but within a minute shuts off. I have a GS 115 Buderus Logano Submitted on 3-10-2022 at 20:26

    Reply Report abuse


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus Logano G115 WS at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus Logano G115 WS in the language / languages: English as an attachment in your email.

The manual is 0,44 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus Logano G115 WS

Buderus Logano G115 WS Installation Guide - English - 60 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info