638656
3
Zoom out
Zoom in
Previous page
1/48
Next page
LR, LRK, LR-NT, LRK-NT 21 - 32
We reserve the right to make changes to dimensions and construction 1 edition 30.10.2007
© Copyright YGNIS AG CH-Ruswil
Table of Contents
1.
Precautions 2
2. Description 3
2.1. General information 3
2.2. Conformity and certificates 4
3. Scope of supply 4
4. Technical data 5
4.1. Main data / operating conditions 5
4.2. Minimum operating pressure 5
4.3. Required water quality 5
4.4. Dimensions 6
4.5. Dimensions of custom made models 8
4.6. Technical data 10
4.7. Additional data for Pyronox LRK and LRK-NT 22
4.8. Correction values for different operating conditions 28
5. Boiler control panel 31
5.1. Description 31
5.2. Basic equipment 31
5.3. Optional features 31
5.4. Governor types 31
5.5. Cable sets 31
6. Installation guide 32
6.1. Boiler room and boiler room ventilation 32
6.2. Planning dimensions 32
6.3. Hydraulic connection 34
6.4. Electrical installation 35
6.5. Turbulators 35
6.6. Boiler control panel and casing assembly 36
6.7. Connecting the burner and ARF-blower 36
6.8. Flue gas system 38
7. Operating conditions 39
7.1. Fuels 39
7.2. Combustion air 39
7.3. Filling the installation and water quality 39
7.4. Protection against corrosion 39
7.5. Requirements for operation 39
8. Operation 40
8.1. Commission 40
8.2. Decommission 40
8.3. First steps to take in case of failure 41
9. Maintenance 42
9.1. Periodical checks and maintenance operations 42
9.2. Boiler cleaning 42
9.3. Burner maintenance 42
10. Spare parts 43
10.1. Pyronox LR 21-26 43
10.2. Pyronox LRK 21-26 44
10.3. Pyronox LR 27-32 45
10.4. Pyronox LRK 27-32 46
3


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Ygnis Pyronox LRK-NT at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Ygnis Pyronox LRK-NT in the language / languages: English as an attachment in your email.

The manual is 1,29 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Ygnis Pyronox LRK-NT

Ygnis Pyronox LRK-NT Usermanual and installation guide - Dutch - 46 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info