769343
2
Zoom out
Zoom in
Previous page
1/72
Next page
2
TABLE OF CONTENTS
Introduction
Boiler Specification
General Requirements
Boiler Installation Sequence
General information . . . . . . . . . . . . . . . . . . . . . . . . . .5
EC designation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
List of Contents Contents included with boiler . . . . . . . . . . . . . . . . . . . .4
Technical data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Boiler connections . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Functional diagram . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Related documents . . . . . . . . . . . . . . . . . . . . . . . . . . .9
Boiler location . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
Gas supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
Flue system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
Rear outlet flue system . . . . . . . . . . . . . . . . . . . .11
Top outlet flue system . . . . . . . . . . . . . . . . . . . .11
Extended top outlet flue system . . . . . . . . . . . . . .11
Flue termination . . . . . . . . . . . . . . . . . . . . . . . .12
Air supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
Cupboard or compartment ventilation . . . . . . . . . . . . . .13
Electrical supply . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
Guide to system requirements . . . . . . . . . . . . . . . . . . .14
Water circulation system . . . . . . . . . . . . . . . . . .14
Filling and make up . . . . . . . . . . . . . . . . . . . . .14
Pressure relief valve . . . . . . . . . . . . . . . . . . . . .14
Pressure gauge . . . . . . . . . . . . . . . . . . . . . . . .14
Expansion vessel . . . . . . . . . . . . . . . . . . . . . . .15
Circulating pump . . . . . . . . . . . . . . . . . . . . . . .16
System by-pass . . . . . . . . . . . . . . . . . . . . . . . . .16
Venting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
DHW expansion vessel accessory . . . . . . . . . . . .16
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
Preparation of boiler location . . . . . . . . . . . . . . .17
Selecting position of boiler . . . . . . . . . . . . . . . . .17
Using boiler template . . . . . . . . . . . . . . . . . . . . . . . . .18
Fitting the boiler hanging bracket . . . . . . . . . . . . . . . . .19
Install the flue system . . . . . . . . . . . . . . . . . . . . . . . . .19
Fitting the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Removing boiler casing . . . . . . . . . . . . . . . . . . . . . . .20
Gas supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
Cold water mains inlet and hot water outlet . . . . . . . . . .22
Central heating flow and return pipework . . . . . . . . . . .23
Connecting the flue system to the boiler . . . . . . . . . . . .24
Electrical installation general requirements . . . . . . . . . . .25
Connecting to the main supply . . . . . . . . . . . . . . . . . .26
Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28
Fit boiler casing . . . . . . . . . . . . . . . . . . . . . . . . . . . .30
Commissioning Part I Preliminary electrical checks . . . . . . . . . . . . . . . . . . . .31
Gas supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
Water supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
Filling the heating system . . . . . . . . . . . . . . . . . . . . . .33
Draining the heating system . . . . . . . . . . . . . . . . . . . .33
Initial system flush (`cold`) . . . . . . . . . . . . . . . . . . . . . .33
2


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Vaillant TURBOmax Pro 28-2 E at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Vaillant TURBOmax Pro 28-2 E in the language / languages: English as an attachment in your email.

The manual is 2.64 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info