612933
2
Zoom out
Zoom in
Previous page
1/4
Next page
EBR - 2
CONTROL OF LIQUID LEVEL
INSTRUCTIONS FOR USE
DESCRIPTION
The EBR - 2 enables the user to fill up and drain wells and tanks.
INSTALLATION
WARNING: The installation and assembly of electrical appliances must
be carried out by an authorised fitter or wireman.
The apparatus is equipped with an internal safety circuit to protect it
against interference. However, some particularly strong electromagnetic
fields cause disturbance to operation.
Interference can be prevented if the following installation standards are
taken into account.
- The apparatus must not be installed close to inductive circuits
( motors, engines, transformers, contact units, etc. ).
- It is advisable to provide a separate line for power supply
( where necessary it should be equipped with a filter network ).
- The inductive charges must be provided with interference
suppressors, such as varistors and RC currents.
The cable used for the sensors must be as short as possible. Insulated
cabling at least 1.5 mm
2
. shall be used. If this distance has to be greater
than 100 m. for any reason, or if disturbance is envisaged, it is advisable
that the cable be metal clad, either using earthed, screened cable or a
dedicated metal conduit.
Wires have to be connected to the top part of the probes, assuring a good
connection with the screw.
ASSEMBLY:
It must be installed inside a switch cupboard, with a 35 mm. symmetrical
profile, in accordance with Standard EN 60715 ( Rail Din ).
CONNECTION:
It must be connected in accordance with the following diagram:
DESCRIPTION OF THE SENSORS
Sensor 1: Minimum tank level
Sensor 2: Maximum tank level.
Sensor 3: Located at the bottom of the well or, if metal,
connected to the casing.
Sensor 4: Minimum safety level in the well.
Sensor 5: Minimum service level in the well.
OPERATION
The EBR - 2 enables the user to drain a well until the water level lies
below Sensor 4 (opening circuit 9 - 10), and will not return to service until
the water level reaches sensor 5 (closing circuit 9 - 10). The EBR - 2 will
set the pump in operation (closing circuit 7 - 9), when the level in the tank
lies below sensor 1, and will stop the pump (opening circuit 7 - 9) when it
reaches sensor 2.
STATE OF THE APPARATUS
Tank full ( 9 - 7 open ) Tank led ON.
Tank empty ( 9 - 7 closed). Tank led OFF.
Well full ( 9 - 10 closed) Well led ON.
Well empty ( 9 - 10 open ). Well led OFF.
ADJUSTING THE CONDUCTIVITY
Although the apparatus is calibrated before it leaves the factory, if the
level in the well is above level 5 and the led fails to light up, adjust the
potentiometer in the well until it does light up. If the level in the tank
reaches sensor 2 and the led in the tank fails to light up, adjust the
potentiometer until it does.
If the user wishes to adjust the EBR - 2 more accurately the tank
terminals ( terminals 1 - 2 ) have to be disconnected when the
conductivity is being adjusted. The well terminals ( terminals 4 - 5 ) have
to be disconnected before adjusting the tank conductivity.
TECHNICAL CHARACTERISTICS
Supply 230 V~ or 400 V~ 50-60 Hz
Breaking Capacity 8(2) A/250 V~; 4(1) A/400 V~
Consumption 4 VA max.
Sensitivity From 0 kΩ to 50 kΩ
Sensor Voltage 13 V
Operation Temperature -10 ºC to +45 ºC
Type of Protection IP 20 in accordance with
Standard EN 60529.
UNE 20324
Class de Protection II in accordance with Standard
EN 60335 when correctly
assembled
DIMENSIONS
A016.23.49039
M
1110
9
12
8
7
TANK
WELL
5
EBR-2
2
1
3
4
6
M
0 V
230V
B
6-11 230V
6-12 400V
POTENTIOMETER
ADJUSTMENT
CONDUCTIVITY
TANK
GAUGE
LUMINOUS
TANK
POTENTIOMETER
ADJUSTMENT
CONDUCTIVITY
WELL
GAUGE
LUMINOUS
WELL
On
On
123
534
78910
ORBIS TECNOLOGÍA ELÉCTRICA, S.A.
Lérida, 61 E–28020 MADRID
Teléfono:+ 34 91 5672277; Fax:+34 91 5714006
E-mail: info@ orbis.es
http://www.orbis.es
71.5
59.5
86
45
2


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Orbis EBR - 2 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Orbis EBR - 2 in the language / languages: English, German, French, Spanish as an attachment in your email.

The manual is 0,23 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info