610981
4
Zoom out
Zoom in
Previous page
1/8
Next page
04
HI-LINE LV Fan Convector
7.0 Water Connections
l Connect unit to system flow and return pipes using the two
15mm isolating valves (see fig. 3).
l Ensure system is flushed in accordance with recognized best
practice and a suitable inhibitor is added to the system as
necessary.
l Open valves fully, check pipe connections for leaks and vent
the heat exchanger - see Commissioning Procedure.
//
//
//
//
///
///
///
///////
/////////
//////
//////////
///////////////////////////
/////
/////
Fig. 3
5.0 Preparation
Before proceeding with the installation, unpack the carton
contents and check against the checklist below:
1. HI-LINE LV unit.
2. 15mm isolating valves (1 pair).
3. Instruction manual.
4. Warranty card.
5. Fixing kit (rubber mounts, cable gland and equipotential bond
pipe clamp).
6. Transformer.
6.0 Fixing
l Using the fixing dimensions below (see fig. 2), mark the fixing
hole positions on the wall.
l Drill and plug the wall for No. 8 x 40mm round head wood
screws ensuring that the wall plugs are suitable for the wall
type.
l Remove the backing from the self-adhesive washers and place
on screws with adhesive side towards the point.
l Tighten the screws into the wall leaving about 9mm
projecting.
l Press adhesive washers to the wall.
Remove the outer casing as follows:
l
Remove the 2 screws from the underside of the unit (see fig. 2).
l Lift off the outer case.
l Fit chassis on to mounting screws and tighten.
Note: Before proceeding with pipe-work connections check that
the unit is level. If the right hand end is lower than the left then
the ability to vent the unit may be restricted.
When water connections and electrical connections have been
completed and the unit has been vented, fit the outer cover and
secure with fixing screws.
///
///
///
//
//
//
//
//
Fig. 2
xxxxxx HiLine LV manual_Layout 1 27/06/2011 09:39 Page 5
4


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Myson HI-LINE LV Fan Convector 7-4 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Myson HI-LINE LV Fan Convector 7-4 in the language / languages: English as an attachment in your email.

The manual is 0,08 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info