588592
24
Zoom out
Zoom in
Previous page
1/26
Next page
1. The test operation must be carried out after the entire installation has been completed.
2. Please confirm the following points before the test operation:
3. According to the user s re quirement, in stall th e re mote c ontroller fr ame w here th e re mote
controller s s ignal c an r each th e in door u nit s moothly.
4. Test operation
TEST OPERCETION
The indoor unit and outdoor unit are installed properly.
Tubing and wiring are correctly completed.
The refrigerant pipe system is leakage-checked.
The drainage is unimpeded.
The heating insulation works well.
The ground wiring is connected correctly.
The length of the tubing and the added stow capacity of the refrigerant have been recorded.
The power voltage fits the rated voltage of the air conditioner.
There is no obstacle at the outlet and inlet of the outdoor and indoor and indoor units.
The gas-side and liquid-side stop values are both opened.
The air conditioner is pre-heated by turning on the power.
Set the air conditioner under the mode of COOLING with the remote controller, and
check the following points per the Owner s M anual If th ere is a ny m alfunction, p lease
resolve it through chapter Troubles And Causes in the Owner s Manual .
22
Disassemble the bolts from the maintenance board, and pull it in the direction of the arrow
to remove the protection board.
Notice: Do not scratch the surface during operation.
ATTENTION: Chart 45 is based on one type of outdoor units, which may look different
from your own outdoor unit.
The Outdoor Units
Protection
board
Terminator
Chart 46
24


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Midea MTA3-24HRN1 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Midea MTA3-24HRN1 in the language / languages: English as an attachment in your email.

The manual is 0,61 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Midea MTA3-24HRN1

Midea MTA3-24HRN1 User Manual - English - 22 pages

Midea MTA3-24HRN1 User Manual - Dutch - 9 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info