590778
3
Zoom out
Zoom in
Previous page
1/96
Next page
GMC-I Messtechnik GmbH 3
Key
Overview of Device Settings and Measuring Functions
1)
nur MXTRA & SECULIFE IP
2)
nur MXTRA
3)
nur MTECH+ & MXTRA
Test Instrument and Adapter
1 Control panel with keys and
display panel with detent for
ideal viewing angle
2 Eyelets for attaching the
shoulder strap
3 Rotary selector switch
4 Measuring adapter (2-pole)
5 Plug insert (country specific)
6 Test plug (with retainer ring)
7 Alligator clip (plug-on)
8 Test probes
9 t key ON/START *
10 I key I
N
/compens./Z
OFFSET
11 Contact surfaces for finger
contact
12 Test plug holder
13 Fuses
14 Holder for test probes (8)
Connections for Current Clamp,
Probe and PRO-AB Adapter
15 Current clamp connection 1
16 Current clamp connection 2
17 Probe connection
Interfaces, Charger Jack
18 Bluetooth
®
19 USB slave for PC connection
20 RS 232 for connecting barcode
scanner or RFID reader
21 Jack for Z502P charger
Attention! Make sure that no
batteries are inserted before
connecting the charger.
22 Battery Compartment Lid
(compartment for batteries
and replacement fuses)
Please refer to section 17 for
explanations regarding control
and display elements.
Battery level indicator
Meas. function
Meas. in progress /
Memory occupancy
Measured
Parameter
Display Panel
PE
Save value
Battery full
Battery OK
Battery weak
Battery (nearly)
Battery level indicator
BAT
BAT
BAT
BAT
Memory occupancy display
MEM
Memory half full
MEM
Memory full > transfer data to PC
Connection Test – Mains Connection Test ( section 18)
N
PE
L
N
PE
L
)(
Connection OK L and N reversed
N
PE
L N
PE
L
x
N
PE
L N
PE
L
x
x
RUN READY
Connection test section 18
depleted: U < 8 V
L
PE
N
x
L
PE
N
These operating instructions describe a tester with
software version SW-VERSION (SW1) 01.15.00
* Can only be switched on with the key on the instrument
Bluetooth
®
active:
quantities
stopped
Switch
Setting,
Descr. on
Picto-
graph
Device Settings
Measuring Functions
SETUP
page 8
Brightness, contrast, time/date, Bluetooth®
Language (D, GB, P), profiles (ETC, PS3, PC.doc)
Default settings
< Test: LED, LCD, acoustic signal
Rotary switch balancing,
battery test >
Measurements with line voltage
U
page 16
Single-phase measurement U
L-N-PE
UL-N Voltage between L and N
UL-PE Voltage between L and PE
UN-PE Voltage between N and PE
US-PE Voltage between probe and PE
f Frequency
3-phase measurement U
3~
UL3-L1 Voltage between L3 and L1
UL1-L2 Voltage between L1 and L2
UL2-L3 Voltage between L2 and L3
f Frequency
Phase sequence
Appears for all meas.
shown below:
U / U
N
Line voltage / nominal line voltage
f / f
N
Line frequency / nominal line frequency
IN
page 18
UIN Contact voltage
ta Tripping time
RE Earth resistance
IF
page 20
UIN Contact voltage
I Residual current
RE Earth resistance
ZL-PE
page 26
ZL-PE Loop impedance
IK Short-circuit current
ZL-N
page 28
ZL-N Line impedance
IK Short-circuit current
RE
page 30
2-pole measurement (ground loop) RE(L-PE)
2-pole measurement with country spec. plug
3-pole measurement (2-pole with probe)
Selective meas. with current clamp sensor
UE Earth electrode voltage (probe/clamp)
Measurements at voltage-free objects
RE
(MPRO)
(MXTRA)
page 37
3-pole measurement
4-pole measurement
Selective measurement with current clamp sensor
2-clamp measurement (earth loop res.)
Soil resistivity
E
RLO
page 47
RLO Low-resistance with polarity reversal
RLO+, RLO– Low-resistance, single-pole
Roffset Offset resistance
RISO
page 44
RISO Insulation resistance
RE(ISO) Earth leakage resistance
U Voltage at the test probes
UISO Test voltage
Ramp: triggering/breakdown voltage
SENSOR
page 50
I
L/AMP
Residual or leakage current
T/RF Temperature/humidity (in preparation)
EXTRA
page 51
U Voltage drop measurement
ZST Standing surface insulation impedance
kWh test Meter start-up test, earth contact plug
IL
1
Leakage current meas. with Z502S adapter
IMD
2
Check insulation monitoring device
Ures
2
Residual voltage test
ta + I
2
Intelligent ramp
RCM
2
RCM (residual current monitor)
e-mobility
3
Electric vehicles at charging stations (IEC 61851)
PRCD
2
Testing of PRCDs type S and K
AUTO
page 64
Automatic test sequences
3


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gossen Metrawatt PROFITEST MBASE plus at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gossen Metrawatt PROFITEST MBASE plus in the language / languages: English as an attachment in your email.

The manual is 2,28 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info