*AllinstallationsinEnglandandWalesmustbenotiedtoLocalAuthorityBuildingControl(LABC)eitherdirectlyorthrougha
CompetentPersonsScheme.ABuildingRegulationsComplianceCerticatewillthenbeissuedtothecustomer.
www.centralheating.co.uk
©HeatingandHotwaterIndustryCouncil(HHIC)
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failuretoinstallandcommissionaccordingtothemanufacturer’sinstructionsandcompletethisBenchmarkCommissioningChecklistwillinvalidatethe
warranty.Thisdoesnotaffectthecustomer’sstatutoryrights.
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
Customername: Telephonenumber:
Address:
Boilermakeandmodel:
Boilerserialnumber:
Commissionedby(PRINTNAME): GasSaferegisternumber:
Companyname: Telephonenumber:
Companyaddress:
Commissioningdate:
To be completed by the customer on receipt of a Building Regulations Compliance Certicate*
BuildingRegulationsNoticationNumber(ifapplicable):
CONTROLS(ticktheappropriateboxes)
Timeandtemperaturecontroltoheating
Roomthermostatandprogrammer/timer Programmableroomthermostat
Load/weathercompensation Optimum start control
Timeandtemperaturecontroltohotwater Cylinderthermostatandprogrammer/timer CombinationBoiler
Heatingzonevalves Fitted Notrequired
Hotwaterzonevalves Fitted Notrequired
Thermostaticradiatorvalves Fitted Notrequired
Automaticbypasstosystem Fitted Notrequired
Boilerinterlock Provided
ALL SYSTEMS
ThesystemhasbeenushedandcleanedinaccordancewithBS7593andboilermanufacturer’sinstructions Yes
Whatsystemcleanerwasused?
Whatinhibitorwasused? Quantitylitres
Hasaprimarywatersystemlterbeeninstalled? Yes No
CENTRAL HEATING MODE measureandrecord:
Gasrate m³/hr OR ft³/hr
Burneroperatingpressure(ifapplicable) mbar ORGasinletpressure mbar
Centralheatingowtemperature °C
Centralheatingreturntemperature °C
COMBINATION BOILERS ONLY
Istheinstallationinahardwaterarea(above200ppm)? Yes No
Ifyes,andifrequiredbythemanufacturer,hasawaterscalereducerbeentted? Ye s No
Whattypeofscalereducerhasbeentted?
DOMESTIC HOT WATER MODEMeasureandRecord:
Gasrate m³/hr OR ft³/hr
Burneroperatingpressure(atmaximumrate) mbar ORGasinletpressureatmaximumrate mbar
Coldwaterinlettemperature °C
Hotwaterhasbeencheckedatalloutlets Yes Temperature °C
Waterowrate I/min
CONDENSING BOILERS ONLY
Thecondensatedrainhasbeeninstalledinaccordancewiththemanufacturer’sinstructionsand/orBS5546/BS6798 Yes
ALL INSTALLATIONS
Recordthefollowing:
Atmax.rate:COppm AND CO/CO
²
Ratio
Atmin.rate:(wherepossible)COppm AND CO/CO
²
Ratio
TheheatingandhotwatersystemcomplieswiththeappropriateBuildingRegulations Yes
Theboilerandassociatedproductshavebeeninstalledandcommissionedinaccordancewiththemanufacturer’sinstructions Yes
Theoperationoftheboilerandsystemcontrolshavebeendemonstratedtoandunderstoodbythecustomer Yes
Themanufacturer’sliterature,includingBenchmarkChecklistandServiceRecord,hasbeenexplainedandleftwiththecustomer Ye s
CommissioningEngineer’sSignature
Customer’sSignature
(Toconrmsatisfactorydemonstrationandreceiptofmanufacturer’sliterature)
www.centralheating.co.uk
77


Need help? Post your question in this forum.

Forumrules
1

Forum

ariston-clas-system-one

Reset search

  • What gas regulator do I need for a LPG cares one boiler Submitted on 21-2-2022 at 18:40

    Reply Report abuse


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Ariston Clas System One at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Ariston Clas System One in the language / languages: English as an attachment in your email.

The manual is 11,88 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info