employed, and the appropriate percentage of gas (25 % maximum) is conrmed. Leak detection uids are suitable
for use with most refrigerants but the use of detergents containing chiarine shall be avoided as the chiarine may
react with the refrigerant and corrode the copper pipe-work. If a leak is suspected, all naked ames shall be
removed/extinguished. If a leakage of refrigerant is found which requires brazing, all of the refrigerant shall be
recovered from the system, or isolated (by means of shut off valves) in a part of the system remote from the leak.
For appliances containing ammable refrigerants, oxygen free nitrogen (OFN) shall then be purged through the
system both before and during the brazing process.
Removal and evacuation
When breaking into the refrigerant circuit to make repairs or for any other purpose conventional procedures shall
be used. However, for ammable refrigerants it is important that best practice is followed since ammability is a
consideration.
The following procedure shall be adhered to:
remove refrigerant;
purge the circuit with inert gas; evacuate;
purge again with inert gas;
open the circuit by cutting or brazing.
The refrigerant charge shall be recovered into the correct recovery cylinders. For appliances containing ammable
refrigerants, the system shall be ushed with OFN to render the unit safe. This process may need to be repeated
several times. Compressed air or oxygen shall not be used for purging refrigerant systems. For appliances
containing ammable refrigerants, ushing shall be achieved by breaking the vacuum in the system with OFN
and continuing to ll until the working pressure is achieved, then venting to atmosphere, and nally pulling down
to a vacuum. This process shall be repeated until no refrigerant is within the system. When the nal OFN charge
is used, the system shall be vented down to atmospheric pressure to enable work to take place. This operation
is absolutely vital if brazing operations on the pipe-work are to take place. Ensure that the outlet for the vacuum
pump is not close to any ignition sources and that ventilation is available.
Charging procedures
In addition to conventional charging procedures, the following requirements shall be followed.
Ensure that contamination of different refrigerants does not occur when using charging equipment. Hoses or
lines shall be as short as possible to minimise the amount of refrigerant contained in them.
Cylinders shall be kept upright.
Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.
Label the system when charging is complete (if not already).
Extreme care shall be taken not to overll the refrigeration system.
Prior to recharging the system, it shall be pressure-tested with the appropriate purging gas. The system shall be
leak-tested on completion of charging but prior to commissioning. A follow up leak test shall be carried out prior
to leaving the site.
Decommissioning
Before carrying out this procedure, it is essential that the technician is completely familiar with the equipment and
all its detail. lt is recommended good practice that all refrigerants are recovered safely. Prior to the task being
carried out, an oil and refrigerant sample shall be taken in case analysis is required prior to re-use of reclaimed
refrigerant. lt is essential that electrical power is available before the task is commenced.
1. Become familiar with the equipment and its operation.
2. Isolate system electrically.
3. Before attempting the procedure, ensure that:
mechanical handling equipment is available, if required, for handling refrigerant cylinders;
all personal protective equipment is available and being used correctly;
the recovery process is supervised at all times by a competent person;
recovery equipment and cylinders conform to the appropriate standards.
4. Pump down refrigerant system, if possible.
5. lf a vacuum is not possible, make a manifold so that refrigerant can be removed from various parts of the
system.
6. Make sure that cylinder is situated on the scales before recovery takes place.
7. Start the recovery machine and operate in accordance with manufacturer’s instructions.
8. Do not overll cylinders. (No more than 80% volume liquid charge).
9. Do not exceed the maximum working pressure of the cylinder, even temporarily.
10. When the cylinders have been lled correctly and the process compieted, make sure that the cylinders and
the equipment are removed from site promptly and all isolation valves on the equipment are closed off.
11. Recovered refrigerant shall not be charged into another refrigeration system unless it has been cleaned and
15


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Argo DRY PURY EVO 11-13 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Argo DRY PURY EVO 11-13 in the language / languages: English as an attachment in your email.

The manual is 9.31 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Argo DRY PURY EVO 11-13

Argo DRY PURY EVO 11-13 User Manual - German - 18 pages

Argo DRY PURY EVO 11-13 User Manual - French - 18 pages

Argo DRY PURY EVO 11-13 User Manual - Italian - 18 pages

Argo DRY PURY EVO 11-13 User Manual - Portuguese - 18 pages

Argo DRY PURY EVO 11-13 User Manual - Spanish - 106 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info